Projects

Moor Hall

Moor Hall

Moor Hall

5.00 metre x 2.50 metre Island canopy, with air replacement through tile replacement grilles in the ceiling, positioned around the kitchen

Moor Hall

4.00 metre Wall canopy, linked for frying section of the kitchen, canopy complete with stainless steel infill above to hide ducting and retain a cleanable hygienic surface.

Cento, 100 The Broadway, Wimbledon. London. SW19 1RH

cento

Stale air removal and tepid air replacement, through linear grilles in restaurant ceiling, creating a push pull effect for a comfortable eating and working environment.

cento

Stainless steel canopy and wall cladding, complete with air replacement grilles at the front to give a good air replacement and a cross flow of air, within a busy kitchen. Protective plastic covering is removed prior to commissioning once the kitchen is operable.

Big Johns Fast Food, High Street, Kingsheath. Birmingham

Completed November 2010

Big Johns

304 Grade wall canopy complete with lights and 304 grade stainless steel wall cladding behind

Blaire Peach Primary School, Southall

Completed August 2010

Removal of Aluminium canopy with filter capture plenum in the middle only and replaced with 304 grade stainless steel island canopy complete with fresh air supply system and gas interlock.

Blaire

304 grade Satin finish stainless steel island canopy, complete with stainless steel baffle filters. With a tepid air supply by means of a inline heater battery, replacing 80% of the volume of extracted air

Blaire

500 lux plenum mounted lights plenum mounted

Blaire

Fully welded drain channel and drain taps, centre and on both ends for easy cleaning

Hathaway Primary School, Ealing

Completed July 2010

Removal of old glass style canopy and replaced with 304 grade stainless steel canopy complete with fresh air supply system and gas interlock.

Hathaway